Case Studies

Case Studies

UKSE Group specialise in supplying skilled labour to both local and national contractors.

Our expert, in depth industry knowledge mean that we offer so much more than other labour sourcing companies. We are defined by the relationships we have with both our Clients and our Candidates and have built a reputation on delivery excellence.


Client Requirement: SUPPORT LABOUR 
Client: THAMES WATER/KSB
Location : MOGDEN STW

Overview  
Due to the start of the Rugby World Cup 2015 and the resulting short-term, considerable increase in sewage within the area of London. Thames Water contracted our client to carry out work on the storm tanks, on a major UK STW , to get them fit for purpose. This meant the client was tasked with reinstating blowers on actuators in multiple tanks, within a short time frame.

UKSE Solution
UKSE provided qualified site labour with previous Sewage industry experience. The works were completed swiftly and safely to the high standard both our client and Thames Water expected. UKSE also provided site supervision plus mechanical fitters and industrial electricians.

Client Requirement : FULL SITE TEAM Client : THORNE POULTRY
Location : THORNE, ENGLAND

Overview
UKSE Group provided both labour and plant services for a number of new build aeration tanks (and associated equipment) for a poultry factory in Thorne.

UKSE Solution
UKSE provided both experienced, qualified site supervision and labour to install a number of aeration tanks. This included pipework, pumps, valves, disc diffusers, blowers, mixers and steel access platforms. For the duration of the project, UKSE provided full site welfare, including full PPE, site supervision, mechanical and semi-skilled fitters and labourers.

Client Requirement : OFFSHORE ENGINEER
Client: BP
Location: SOUTH CHINA SEA

Overview
Our client required an additional Offshore Engineer to work on a reverse osmosis machine, during a tow from South Korea to Singapore.

UKSE Solution
UKSE provided a fully qualified offshore engineer, with extensive experience working with reverse osmosis machines. The engineer provided was able to fulfil the client requirement to work over the festive and New Year period.